Optimizing Structural Member Sizing Before Preliminary Design: A Practical Guide

A practical workflow to compare timber, steel, and concrete framing options, structural depth, mass, and carbon in early-stage building design.

The Concept Framing Dilemma: Why Late-Stage Changes Cost

During concept and schematic design, the decisions made in the first 10% of a project's lifecycle dictate up to 80% of its final cost, structural performance, and environmental impact. Yet, this is precisely when design teams face the greatest uncertainty.

Architects need fast, reliable floor depths and column spacing to lock in floor-to-floor heights and spatial layouts.

Builders and Developers demand realistic material quantity indicators to guard against late-stage cost overruns.

Clients and Regulatory Frameworks increasingly require low-carbon targets right from the initial feasibility phase.

For structural engineers, balancing these competing priorities often creates a major workflow bottleneck. Building complete finite element analysis (FEA) models or running tedious manual spreadsheets for three or four material permutations takes days—often for options that get scrapped after the next coordination meeting.

Phase 1: Concept Sizing

Preliminary Material Sizing via Traditional "Rules of Thumb"

↓
Phase 2: Planning

Spatial & Planning Approvals Locked In

↓
Late-Stage Bottlenecks & Design Failures
Spatial Deficits

Floor usage changes & structural depth increases reduce clearance.

Foundation Overruns

Self-weight forces unexpected footing & piling redesigns.

Carbon Blowout

Unoptimized framing exceeds initial project carbon targets.

The solution isn't doing full structural design earlier; it's streamlining early-stage comparative analysis across four essential structural metrics:

1 Structural Depth & Spans

Floor-to-floor heights drive the building envelope. Comparing GLT/CLT, open-web joists, steel beams, and concrete slabs upfront ensures structural zones fit within early architectural constraints.

2 Self-Weight & Substructure

Superstructure material selection dictates foundation requirements. Transitioning from heavy concrete to lightweight timber or cold-formed steel can dramatically reduce footing sizes.

3 Material Quantity Takeoffs

Early cost estimates frequently fail when relying on gross m² rates. Generating mass and volume takeoffs early gives quantity surveyors a reliable foundation for cost planning.

4 Embodied Carbon Intensity

Global Warming Potential (GWP) targets can no longer be an afterthought. Calculating upfront carbon emissions during framing comparison enables teams to benchmark sustainable choices.

Worked Comparison: 8m × 8m Commercial Floor Grid

To illustrate how material selection impacts early design metrics, consider a typical 8m × 8m structural floor module carrying standard office loading with Live Load 3.0 kPa and Superimposed Dead Load + 1.5 kPa:

Performance Metric Option A: Mass Timber
(CLT + Glulam)
Option B: Composite Steel
(Beams + Deck)
Option C: Concrete
(Post-Tensioned Slab)
Typical Structural Depth 450 - 520mm 380 - 450mm 200 - 240mm
Self-Weight Impact Very Low
~ 1.2 - 1.8 kN/m2
Moderate
~ 2.8 - 3.5 kN/m2
High
~ 5.0 - 6.0 kN/m2
Embodied Carbon Indicator Lowest
(A1-A3 net low/negative GWP)
Moderate
(High recycled content option)
Highest
(Portland cement dominant)
Speed & Erection Rapid dry construction Fast modular assembly Curing time required
Substructure Impact Minimal footing load Standard footing load Heaviest foundation demand

📌 Note on Structural Variables:

Relative values vary based on specific local supply chains, fire rating requirements (REI ratings), and acoustic ceiling treatments.

Streamlining Scheme Options in Minutes with StruCompare

Evaluating these trade-offs manually for every project brief consumes valuable engineering hours. StruCompare was built to eliminate this friction, giving architects, builders, and structural engineers an instant, automated portal for concept-stage structural sizing.

StruCompare Scheme Analysis Workflow

Accelerate concept design in four simple steps:

  1. Input a floor outline and basic design information aligned with local building standards.
  2. Instantly generate preliminary member layout and sizing across timber, structural steel, cold-formed steel, and concrete options.
  3. Compare structural depth, total frame weight, material quantities, and embodied carbon in real time.
  4. Export clean comparison summaries to present directly in client design meetings and coordinator workshops.